[Construction Example] Community Center / Oguni, Nagaoka City, Niigata Prefecture
Assemble the tension material and the two-beam structure on the ground! Construction was carried out using the Tech One series.
Here is an introduction to a case study of a community center constructed in Oguni, Nagaoka City, Niigata Prefecture. It is a building resembling a framed structure with braces. The combined beam with two materials and braces was assembled in the factory using structural screws and adhesive, and then transported. The tension materials and the two-material beams were assembled on-site. You can view the detailed content of the case study through the related links, so please take a look. 【Case Overview】 ■ Span: 8–10m ■ Fire Resistance: None ■ Completion Year: 2018 ■ Construction Location: Oguni, Nagaoka City, Niigata Prefecture ■ Total Floor Area: 516.79m² ■ Hardware Used: Tech One Series *For more details, please refer to the PDF materials or feel free to contact us.
- Company:タツミ
- Price:Other